Post-Harvey Project Summary – Lighting Improvements at Steep Bank Creek Pump Station

Updated: July 27, 2023
Project Name Lighting Improvements at Steep Bank Creek Pump Station
Short Project Description Add lighting structures at the pump station to improve visibility for emergency operations.
Additional Technical Information District engineer designed these upgrades into the expansion project and was constructed under the Pump Station contract as an add-in project.
Estimated Total Project Cost (including engineering and contingency) Included in the project ‘Steep Bank Creek Pump Station Expansion’.
Estimated LID 19 Cost and Sharing Basis The project was shared between the District and Fort Bend County LID 15.
Project Status Completed in 2023
Financing Source Financing was done by both LID 15 and 19 in the Pump Station expansion contract.