Post-Harvey Project Summary – Lighting Improvements at Steep Bank Creek Pump Station

Project Name Lighting Improvements at Steep Bank Creek Pump Station
Short Project Description Add lighting structures at the pump station to improve visibility for emergency operations.
Additional Technical Information The district engineer is currently evaluating the level of visible light the project needs for emergencies occurring in the evening while abiding by Fort Bend County outdoor lighting regulations.
Estimated Total Project Cost (including engineering and contingency) TBD
Estimated LID 19 Cost (if Projects will be shared) and Sharing Basis The project is proposed to be shared between the District and Fort Bend County LID 15. The share split between the two districts is to be determined.
Estimated Schedule 2021
Project Status Project is expected to commence during the expansion at the pump station.
Financing Source TBD