Project Name |
Lighting Improvements at Steep Bank Creek Pump Station |
Short Project Description |
Add lighting structures at the pump station to improve visibility for emergency operations. |
Additional Technical Information |
The district engineer is currently evaluating the level of visible light the project needs for emergencies occurring in the evening while abiding by Fort Bend County outdoor lighting regulations. |
Estimated Total Project Cost (including engineering and contingency) |
TBD |
Estimated LID 19 Cost (if Projects will be shared) and Sharing Basis |
The project is proposed to be shared between the District and Fort Bend County LID 15. The share split between the two districts is to be determined. |
Estimated Schedule |
2021 |
Project Status |
Project is expected to commence during the expansion at the pump station. |
Financing Source |
TBD |